Home / Completed Projects / Rehabilitation of Bukhara sewerage network II

Rehabilitation of Bukhara sewerage network II

Assignment name:

«Rehabilitation of Bukhara sewerage network»

Design estimate documents.

Country:  Republic of Uzbekistan

Location within country: Bukhara region

Quantity of involved specialists: 7
Name of Client: Bukhara RPE “Suvokova”

Date started of works
 (Month/year):

July 2010

End date
(Month/year):

December 2010

Narrative description of Project:

The project provides:

  • Construction of two sewerage pump stations SP-13, SP-14 with capacity 200m3/hour for each station;
  • Reconstruction of gravity manifolds with diam. 1000mm and length 1,7km;
  • Reconstruction of gravity manifolds with diam. 800mm and length 0,8km;
  • Reconstruction of gravity manifolds with diam. 600mm and length 0,8km;
  • Reconstruction of gravity manifolds with diam. 500mm and length 1,9km;
  • Reconstruction of gravity manifolds and construction of pressure manifolds with diam. 400mm, 300mm and length 1,2km;

Description of actual services provided in the assignment:

Inspection of the current situation, collecting and analysis of basic data.

Full package of Detail Design and Bidding Documents is developed both in Russian and English